| Air Dryer Type | Tower Pressure Gauges Included | Max Inlet Temp. (F) | Max PSI | Phase | Voltage | Flow Rate (scfm) | In/Out Connection | CFM Range | Number of Towers | Price | |
|---|---|---|---|---|---|---|---|---|---|---|---|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 120 | 50 | 1/2" NPT | 50-99 CFM | - |
$5,553.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | - | 120 | 150 PSI | 1 Phase | 240 | 50 | 1/2" NPT | 50-99 CFM | - |
$5,401.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | - | 120 | 150 PSI | 1 Phase | 240 | 50 | 1/2" NPT | 50-99 CFM | - |
$5,579.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 240 | 50 | 1/2" NPT | 50-99 CFM | - |
$5,731.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 240 | 50 | 1/2" NPT | 50-99 CFM | - |
$5,553.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 120 | 100 | 1" NPT | 100-149 CFM | 2 |
$19,508.40
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 120 | 130 | 1" NPT | 100-149 CFM | 2 |
$27,558.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 1 Phase | 230 | 200 | 1 1/2" NPT | 200-499 CFM | 2 |
$30,906.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 3 Phase | 460 | 250 | 1 1/2" NPT | 200-499 CFM | 2 |
$29,008.80
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 3 Phase | 460 | 300 | 1 1/2" NPT | 200-499 CFM | 2 |
$31,092.30
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 3 Phase | 460 | 400 | 2" NPT | 200-499 CFM | 2 |
$37,137.00
|
|
Lead time: 7-10 Days Estimated Lead Time 7-10 Days |
Desiccant | Yes | 120 | 150 PSI | 3 Phase | 460 | 550 | 2" NPT | 500-749 CFM | 2 |
$39,389.00
|
Part Number: HRE-0100-1
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 1 Phase
Voltage: 120
Flow Rate (scfm): 100
In/Out Connection: 1" NPT
CFM Range: 100-149 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0130-1
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 1 Phase
Voltage: 120
Flow Rate (scfm): 130
In/Out Connection: 1" NPT
CFM Range: 100-149 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0200-2
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 1 Phase
Voltage: 230
Flow Rate (scfm): 200
In/Out Connection: 1 1/2" NPT
CFM Range: 200-499 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0250-4
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 3 Phase
Voltage: 460
Flow Rate (scfm): 250
In/Out Connection: 1 1/2" NPT
CFM Range: 200-499 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0300-4
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 3 Phase
Voltage: 460
Flow Rate (scfm): 300
In/Out Connection: 1 1/2" NPT
CFM Range: 200-499 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0400-4
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 3 Phase
Voltage: 460
Flow Rate (scfm): 400
In/Out Connection: 2" NPT
CFM Range: 200-499 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes
Part Number: HRE-0550-4
Air Dryer Type: Desiccant
Hertz: 60 HZ
Max Inlet Temp. (F): 120
Max PSI: 150 PSI
Phase: 3 Phase
Voltage: 460
Flow Rate (scfm): 550
In/Out Connection: 2" NPT
CFM Range: 500-749 CFM
Number of Towers: 2
Tower Pressure Gauges Included: Yes